Dualing of the Eastern and Northern bypass

NEMA is inviting public views on the expansion of the 52km Eastern and Northern bypass dualling plans to be constructed at a cost of Sh 9.25 billion.
The two roads will have service lanes, new roads done in highly developed locations, overpasses and underpasses constructed as well as footbridges and paths done along the roads.
[ATTACH=full]240087[/ATTACH]

CC @Motokubwa

Si spear tena?

When are they starting the project?

@spear alitwambia last week hii project tutaingonja.

Bora wasibomoe kamakis, the talk of town.

Like I mentioned last week so far nimeona tu funding for Northern bypass dualing. I don’t know if they have gotten the same for eastern by pass. If they have I’ll be most happy than all of you put together.

U think u are the only talker with plots/ real estate.

Huyu msee hunibamba walai. Hizi watu wa Membley hujiona hot shit. Akipeleka hapo Mitsubishi outlander kama ametoa wing

Alafu update total rental income yao ni 350k. Alafu anasema happier than all of u put together.

Jamaa kuna watu huku wako 10 times wewe na hawasumbui.

[ATTACH=full]240229[/ATTACH][ATTACH=full]240230[/ATTACH]
accident kibao kwa bypass

Man if you can get 350 K in rental income as a side hustle, you are on a roll!

Really?watu lakini sio wewe yet unaongea ni kama ur a billionaire.

350k wewe bado ni hustler.
Hiyo building unafaa tu kuuza 40/45m. Alafu utafute
Plot mzuri inafaa kukuletea 1m+ to 1.5m.

Wacha emotional attachments

Muhoho Kenyatta si huenda na ndege za babake dubai na pesa zako za taxes. Throw stones at him also

Give us examples of those 1-1.5m plots

Hata Ruto ni hustler! let me stick to my lane :cool:

If I posted photos I would sell out my identity.

Wacha tu niseme ivi 2 br za 35 NNE per floor. Na 1 br za 27.5 NNE per floor. Zitafit kwa plot ya 50*100 visuri sana.

Huko juu wekea watu terrace. Apana weka mabati kama ghasia.

Na wekea watu balconies mingi kubwa. Usisahau tuko 2019 and that balcony must fit a washing machine. Na ukose kuweka internal drainage hapo utapata shida. Kama unaweka tiles weka rough za floor blue in color.

Na ata kama unatak quality. Apana Enda carpets and tiles kama mujinga huko msa road. Utamaliza pesa huko

Hiyo story siezi ata maliza leo

Pia @spear should learn his lane.

Kizungu mingi ndio ako nayo

“the bypass was completed in 2013 at a cost of …” That was the cost of constructing the current bypass, they have not given the cost of the dualing

Watu siku hizi wanaenda Greensport

Yule alijenga the big hotel in upper hill atuambie why the original design was not followed for the Eastern Bypass. That road was meant to be dual from the get go.