Jubilee Dev - Inauguration of 50MW Garissa Solar Power plant in Mbalambala, Garissa County.

President Uhuru Kenyatta inaugurates 50MW Garissa Solar Power plant in Mbalambala, Garissa County. The plant, which is the largest solar energy installation in East and Central Africa, adds to Kenya’s rich profile as the epicenter of green energy generation in Africa. #GarissaSolar #KenyaMbele
[ATTACH=full]276073[/ATTACH][ATTACH=full]276075[/ATTACH][ATTACH=full]276078[/ATTACH][ATTACH=full]276079[/ATTACH][ATTACH=full]276080[/ATTACH][ATTACH=full]276081[/ATTACH][ATTACH=full]276082[/ATTACH][ATTACH=full]276083[/ATTACH][ATTACH=full]276084[/ATTACH][ATTACH=full]276085[/ATTACH][ATTACH=full]276086[/ATTACH][ATTACH=full]276087[/ATTACH][ATTACH=full]276088[/ATTACH][ATTACH=full]276090[/ATTACH][ATTACH=full]276091[/ATTACH][ATTACH=full]276092[/ATTACH][ATTACH=full]276093[/ATTACH][ATTACH=full]276094[/ATTACH]

Zinakaa kuibiwa. I don’t know if security is maximum.

Ironically, power will be more expensive. Mudavadi is bloated like a toad

Sahi kuna mvua all over masinga is threatening to break its banks for fucks sakes!!! Everywhere you go kenya is floating like noah’s ark but kplc wont drop power prices even by a shilling but will be swift to raise when a remote sign of drought is spoted thousands of miles away

Well that can’t happen. The solar panels are all held together with special bolts. Through those metal rails which are then anchored to the ground with concrete…

Yangu Ni 80watts banae

Well that’s not how ERC works. They’re basing there estimates on fuel prices. And they raise prices to counteract market forces.

Even if the dams are full of water. They don’t even generate that much power due to there design limitations…

Behind the scenes cartels

Are you trying to say mama ngina Kenyatta’s diesel generators produce more power than the hydroelectric turbines??

Nairobi residents will continue grappling with water shortages and rationing even though Ndakaini and Sasumua dams are full following heavy rains in the Aberdares. The trend has been blamed on the lower than the optimum capacity of transmission pipes.
Nairobi City Water and Sewerage Company (NCWSC) Managing Director Nahashon Muguna told the Business Daily yesterday that the existing pipes can pump 525,600 cubic metres per day, which is well below the daily water demand of the city’s growing population.
“Rationing of water is there to stay until new lines are built. The current demand is 790,000 cubic metres per day and it has been growing by nearly 20,000 cubic metres every year,” he said.
The current lines were initially set to serve the city up to the year 2000 but the government has not upgraded the infrastructure to meet the rising demand.
City residents currently face water shortages with areas such as Lang’ata, Umoja and Kawangware some of the hardest-hit.
Also Read
[ul]
[li]Banks, businesses forecast inflation above 5pc in 2020[/li][li]Engineers lament slow pace of accreditation[/li][li]Kerosene consumption declines to 13-year low[/li][/ul]
The water crisis has pushed many residents to rely on illegal connections, kiosks and vendors.
The vendors sell a 20-litre jerrycan for as high as Sh100 and concerns that much of the water sold is not safe for human consumption, especially in the informal settlements.
Nairobi Water and Sewerage Company started rationing water to city residents in 2017 due to rapidly plummeting water levels in Ndakaini but this has continued even after the dam filled up.
Residents in different parts of the capital city receive water on specific days of the week, some for a few days, others for just a few hours. In some estates, residents go for weeks without the precious commodity.
In July 2017, there was a cholera outbreak that led to at least three deaths with City Hall blaming it on unsafe water supplies by the vendors.
The county government is banking on the completion of the 11.8-kilometre long Northern Water Collector Tunnel to stabilise supply. The line is set for completion in December next year.
The new line will primarily collect floodwater from Maragua, Gikige and Irati rivers in Murang’a and drain into Ndakaini dam, although this will still not alleviate the problem of water shortage until the city pipeline system is upgraded.

Geothermal is Kenya’s top power source.

Na anafanya nini hapo, by the way!? Ama hata yeye ako na mini-handshake yake?