[ATTACH=full]250963[/ATTACH]
This is outrageous and preposterous!!!
If Msedes ya VC unalipa 30/= na Mazda Carol yako 7k, what is the Govt telling your ass?
Jubilee wajenge road ya toll.Watulipishe toll ndio waibe saidi
Thika rd hio toll haikuwork
It’s 7k per month au?
Hata wakitaka walipishe 1 million per day
Na kama uko na huduma number je?
Per trip!
Stretch is 243Kms and they are proposing Ksh.30 per Km.
Ridiculous. Nobody will use that road
au uendelee kutumia ile baro mzee. i think i’ll just use the mai mahiu road. i like it coz it has some pretty good straights
halafu upitwe na Nyamira Express hapo duka moja @140kph
gari yako iyumbeyumbe hadi inaanguka… i grazed my side door enroute from eldy to nai because some stupid bus driver coming down a corner-hill, chose to use both lanes. i had to move off until the barriers. i was shaken and angry at the same time.
I like the way you are thinking
Since the economy is beyond ICU…they r trying to look 4 all means kurudisha deni ya wenyewe
Sportpesa imekataa kutoa kakitu sasa wameamua ni barabara…