Mark Register; and if you someone please inform them: @kasaman@Jay Ule Msee @wildfrank@Thagichu
A 5 storey apartment block in Kasarani Springs estate being evacuated after an audit revealed the building was not safe for occupation due to questions on its structural integrity
Do people really know what weight sand, stone and cement carry? When it comes down, I can swear the reinforcement will be found to be halved in strength, floor spans increased, thicknesses reduced, mixes weak, and no cube tests or falsified ones if available.
Yaani siku hizi you have to supervise grown ass men to do their job. This week nimevuta 2 employees who were milking me dry. One even tried to sneak out product right under my nose.
50x100 is approx 15x30m. Built floor area at 60% is 270sqm and at a build rate of 30k per square metre, that is 8.1m per floor. If he’s done 80% FA that’s 10.8m per floor.