Kuna birrionaire analilia chooni

MMNN:
FOUR-STOREY BUILDING demolished in Zimmerman, Nairobi; National Buildings Inspectorate officials say apartment was substandard and had cracks.
[ATTACH=full]163431[/ATTACH]

Do you remember that sinking flat in zimmer ya kitambo near the swamp?..I was amazed to see it still standing awhile back.

Why build 5floors of poor workmanship???.. Why not invest on 3 storey building that meets the standards.

I wish they were to do this systematically, street by street, until landlords and developers stop the habit of taking shortcuts and bribing inspectorate officials.

waendelee hivyo till watu wajue shortcuts lead to losses. Hata mtu wa approvals akitaka mchape deal ya kando unaogopa

vumbistan hakuna demolition ball.

Because it’s all about money: use as little as you can to get as much as is possible.

Greed

This particular owner is regretting the things his greed made him do.

Sadly, these guys are not beginners and may have multiple slum-scrapers that were financing this project.

you mean third floor haija sink? gotta visit zimmer one of this days

hio ni hekaya hapa shit hole
Demolition Ball In Fig. 16-37, a 2025 kg demolition ball swings from the end of a crane. The length of the swinging segment of cable is 11 m.

[ATTACH=full]163434[/ATTACH]
(a) Find the period of the swinging, assuming that the system can be treated as a simple pendulum.
s (b) Does the period depend on the ball’s mass?
(100 Likes)

Why not implode it…like the Twin Towers in Murica…ama expertise hakuna huku

The city inspectorate, will be fully reconstituted and given more powers, once a certain political family finishes building a city in the Northern side of Nairobi.
Then, rules and regulations will be followed to the letter. That’s why a few days ago I asked a fellow KTalk who posted his multistorey project here if, he factored installing a lift down the line.
Interesting times ahead.

GREED

¿¿¿¿¿¿

Engineers wa A wa kisasa, unlike sisi wa kitambo tulitua jasho sana kupita exams.

UOTE=“Meria Mata, post: 1548502, member: 139”]hio ni hekaya hapa shit hole
Demolition Ball In Fig. 16-37, a 2025 kg demolition ball swings from the end of a crane. The length of the swinging segment of cable is 11 m.

[ATTACH=full]163434[/ATTACH]
(a) Find the period of the swinging, assuming that the system can be treated as a simple pendulum.
s (b) Does the period depend on the ball’s mass?
(100 Likes)
[/QUOTE]

The Period equals 2pi root (length over gravitational acceleration). From the formula, the mass of the ball is irrelevant. Leta likes

I doubt that would work, the other buildings are way too close.

It’s good to force people to do it right before moving to step 2

haiya,pia were ni A- ya 1994

lift nikutoka 6 floors,hiyo ilikuwa 5.