sgr progress..

[ATTACH=full]210166[/ATTACH]

[ATTACH=full]210165[/ATTACH]

[ATTACH=full]210164[/ATTACH]

[ATTACH=full]210163[/ATTACH]

[ATTACH=full]210162[/ATTACH]

Hapa sio vumbi na kokoto tu…:smiley:

Hapa sio turkish engineers na mobile camps tu.

Hapa sio khashoggi na saudis tu.

:D:D:Dhujaongea poa lakini…

:D:D:D
Huko ndio true vumbistan

In 7 months time President Uhuru Kenyatta will board the SGR train in Nairobi Terminal and be the first passenger of the service between Nairobi and Narok. Its will mark the launch of Phase 2A and he will use it to travel for Madaraka Day celebration in Narok by riding the Madaraka Express SGR passenger train to the destination.

Meanwhile, power installation in
the Ngong-Naivasha second longest tunnel in Africa is ongoing.
[ATTACH=full]210188[/ATTACH]

Mai Mahiu station is energized as power is switched on. [ATTACH=full]210189[/ATTACH][ATTACH=full]210190[/ATTACH]

The track laying process is ongoing right on schedule. These mega machines are super fast and accurate.
[ATTACH=full]210192[/ATTACH]
[ATTACH=full]210194[/ATTACH]

:D:D:D

safi sana

All I see is just Looting.

Dj weka sgr mix
Ama hata looto mix

[ATTACH=full]210206[/ATTACH]

Phew ! ! ! How many Tonnes of earth was moved from here ?

Would love to see the video of how they conquered the shifting sands of suswa and the base station at suswa.

Eating hills like yam

Good progress

Inafanana na 98% wild life an 2% humans.That landscape needs serious development

In 18 months SGR Madaraka Express has carried 2 million passengers. Considering the first 6 months had 2 daily scheduled trips then the number would have been a lot higher. Now we await night schedules to begin. Its been a complete success.
[ATTACH=full]210210[/ATTACH][ATTACH=full]210211[/ATTACH][ATTACH=full]210212[/ATTACH][ATTACH=full]210213[/ATTACH]

Massive environmental damage

Massive

It’s terrible …we seen none like it

Karibu Sana @Vito Corleone Mafi ya kuku

When?